 |  |   Demolition & Reclamation of the Former Middlesbrough General Hospital site.  Client: Barratt Newcastle | Value: £1.7million | Contract Date: 2004  The aim of this contract was to provide a development platform to enable use for a residential end use. Demolition and clearance works were undertaken on existing buildings to enable the remediation works to be undertaken.  Work items included:  Excavation of contaminated soils, underground structures and pipework  Disposal off-site of heavily contaminated soils  Onsite treatment of contaminated soils if and where practicable  Use of excavated materials deemed suitable as backfill  Placement and compaction of materials suitable for reuse (engineered landscape fill)  Pleacement & compaction of clean imported materials  Collection and on-site treatement of encountered groundwater for discharge to sewer  Placement of capping layer beneath adoptable roads to provide a minimum CBR of 15%  Provide a clean cover layer of 1.0m within gardens and 0.5m within public open spaces. | |
|  | |