 |  | Dalton Park, North East Outlet Centre, Murton, Landscaping.  client: Ballast Construction | value: £1.2m contract date: 2002-03  Hellens secured the subcontract to provide the landscaping to support and enhance this retail development from the main contractor Ballast Construction.  Specific aspects of the work included:  Soil amelioration via the incorporation of lime treated bio solids into shales to improve nutrient values  Soil stabilisation using a biodegradable blanket formed from 100% coir fibre  Construction of a lake and two ponds using an advanced lining geomembrane  Formation of an ephemeral stream  Development of a landscape art mound to form a feature at the entrance of the development  Construction of timber boardwalks over wetland features  Excavation and formation of a public access network around the site  Turfing and grass seeding  Tree and shrub planting to include avenues of mature trees  Internal mall planting  Aquatic planting in and around wetland areas | |
|  |